        DMS2030

        Individual Assignment 1

        Due Date: 11:59 pm, October 14th, 2024

        1. A fertilizer company from San Diego has provided the following data.

         

        Last Year ($)

        This Year ($)

        Sales

        23,000

        34,000

        Labor

        10,000

        16,000

        Raw Material

        8,000

        10,000

        Capital Equipment

        2,000

        4,000

        (a) Compute the labor, raw material, and total productivity for each year. (5 points)

        (b) Compute the overall labor, raw material, and total productivity for the two years. (5 points)

        2. The inventory of a supermarket turns 46 times a year. The manager of the supermarket says that everything that the store receives from vendors is, on average, sold in two weeks. Are these statements consistent? Assume there are 52 weeks in a year. (5 points)

        3. A truck rental company serves 30 rental requests per week on average.  Each truck on average is rented for 3 weeks. The rental fee is $1,000 per truck per week. How many trucks are on renton average?  What is the average weekly revenue? (5 points)

        4. A hospital emergency room (ER) is currently organized so that all patients register through an initial check-in process. At his or her turn, each patient is seen by a doctor and then exits the process, either with a prescription or with admission to the hospital. Currently, 55 people per hour arrive at the ER, 10% of who are admitted to the  hospital. On average, 7  people are waiting to  be  registered and  34  are registered and waiting to see a doctor. The registration process takes, on average, 2 minutes per patient. Among patients who receive prescriptions, average time spent with a doctor is 5 minutes. Among those admitted to the hospital, average time is 30 minutes. On average, how long does a patient spend in the ER? On average, how many patients are being examined by doctors? On average, how many patients are there in the ER? Assume the process to be stable; that is, average inflow rate equals average outflow rate.

        Please refer to the diagram next page.

         

        (a) On average, how long does a patient spend in the ER? (5 points)

        (b) On average, how many patients are being examined by doctors? (5 points)

        (c) On average, how many patients are there in the ER? (5 points)

        Note: In the last stage (seeing a doctor), there are two types of patients,i.e. two types of flows. When you consider the average time in the last stage, you should take the weighted average because these two types of patients have different measures.

        5. Elaine owns a computer rental store.  The rental process can be depicted by the following process flow diagram.

         

        Return rate R

        Customer arrivals to the store with an average rate of R = 20 per week and each customer requests for one computer. The rental time is 3 weeks on average. The rental fee is $300 per week. At the end of the rental  period, the customer returns his/her rented  computer to the store. Elaine will inspect every returned computer. The inspection time is negligible. On average 10% of the returned computers need to be repaired by a technician (repair actually means re-configuration and minor repair). A computer that needs repair spends an average time of 1 week in the repair stage, including waiting and repair. After repair work is completed, the computer will be put into the stock for rental. Returned computers that don’t need repair will  be put immediately into the stock for rental. To ensure that there are always computers available to satisfy customer requests, Elaine has to keep an average of 10 computers in the stock for rental.

        (a) What is the total number of computers that Elaine needs for her rental business? (5 points)

        (b) With an average of 10 computers in the stock for rental, on average how much time does a computer spend in the stock for rental before it is rented by a customer? (5 points)

        (c) Elaine estimates that the average rental time will become 2 weeks if she increases the rental fee to $500 per week. The customer arrival rate, the repair time and the percentage of returned computers that need repair will remain the same. Again, she needs to have an average of 10 computers in the stock for rental. Should she increase the rental fee? Justify your answer by considering the number of computers required and the expected revenue per week. (5 points)

        6. Bandai has a production line which produces Doraemon toys. There are three steps: in the molding step, workers transfer plastic into the white figures; in the painting step, worker transfer the white figures into painted figures; in the packing step, workers transfer the painted figures into final boxed toys. Currently, the number of workers and the time needed for each step is listed as follows:

        Step

        Number of Workers

        Time Needed (per Unit per Worker)

        Molding

        5

        5 min

        Painting

        8

        10 min

        Packing

        4

        2 min

        (a) Draw a flowchart to depict the toy production process. (5 points) (b) What is the bottleneck of the process? (5 points)

        (c) Suppose the demand for toys is 60 units per hour. What is the flow rate of the process? What is the capacity utilization for each step? What is the implied utilization for each step? (5 points)

        (d) Bandai plans to hire 17 new workers for the Doraemon production line. How should Bandai train and allocate these workers to different steps in order to maximize the capability of the production line? What if there are 34 new workers? (5 points)

        7. Vernon, Andy, and Sean are getting ready for their last period in the exchange study in CBS. Following the final exams, they intend to throw a big party with many of their friends from back home. Presently, they have identified the following set of activities that need to be completed. They decide to not spend any work on preparing the party until all final exams are over. Moreover, they aim to spend a 3-day beach vacation as early as possible, but not before all party planning activities are completed.

        On June 10, they will enter the final exam week, which will take 5 days. They then want to arrange for live music (which will take 5 days), evaluate a number of potential party sites (6 days), and prepare a guest list, which includes inviting their friends and receiving the RSVPs (7 days).  They want to visit their two most promising party sites, which they expect to take 4 days. However, this can only be done once they have completed the list of party sites. Once they have finished the guest list and received the RSVPs, they want to book hotel rooms for their friends and created a customized T-shirt with their names on it as well as the name of the guest. Hotel room reservation (3 days) and T-shirt creation (6 days) are independent from each other, but both of them require the guest list to be completed. Once they have picked the party site, they want to have a meeting onsite with an event planner, which they expect to take 4 days. And then, once all work is completed, they plan to takeoff to the beach.

        (a) Draw a table to list all the activities, their immediate predecessors, and their durations. Draw the network based on the table. (5 points)

        (b) What is the critical path? (5 points)

        (c) For each activity, compute the slack time. (5 points)

        8. The following table represents a project that should be scheduled using CPM:

         

         

        Time (Days)

        Activity

        Immediate Predecessors

        Optimistic

        Most Likely

        Pessimistic

        A

        -

        1

        3

        5

        B

        -

        1

        2

        3

        C

        A

        1

        2

        3

        D

        A

        2

        3

        4

        E

        B

        3

        4

        11

        F

        C, D

        3

        4

        5

        G

        D, E

        1

        4

        6

        H

        F, G

        2

        4

        5

        (a) Draw the network. (5 points)

        (b) What is the critical path? (5 points)

        (c) What is the probability of completing this project within 16 days? (5 points)

        9. Any suggestions/comments for the class so far? (Optional)


        請(qǐng)加QQ:99515681  郵箱:99515681@qq.com   WX:codinghelp






         

        掃一掃在手機(jī)打開當(dāng)前頁(yè)
      1. 上一篇:代寫COMP3013、代做C/C++,Python語(yǔ)言程序
      2. 下一篇:代寫22753 Cost Management and Analysis
      3. 無(wú)相關(guān)信息
        合肥生活資訊

        合肥圖文信息
        挖掘機(jī)濾芯提升發(fā)動(dòng)機(jī)性能
        挖掘機(jī)濾芯提升發(fā)動(dòng)機(jī)性能
        戴納斯帝壁掛爐全國(guó)售后服務(wù)電話24小時(shí)官網(wǎng)400(全國(guó)服務(wù)熱線)
        戴納斯帝壁掛爐全國(guó)售后服務(wù)電話24小時(shí)官網(wǎng)
        菲斯曼壁掛爐全國(guó)統(tǒng)一400售后維修服務(wù)電話24小時(shí)服務(wù)熱線
        菲斯曼壁掛爐全國(guó)統(tǒng)一400售后維修服務(wù)電話2
        美的熱水器售后服務(wù)技術(shù)咨詢電話全國(guó)24小時(shí)客服熱線
        美的熱水器售后服務(wù)技術(shù)咨詢電話全國(guó)24小時(shí)
        海信羅馬假日洗衣機(jī)亮相AWE  復(fù)古美學(xué)與現(xiàn)代科技完美結(jié)合
        海信羅馬假日洗衣機(jī)亮相AWE 復(fù)古美學(xué)與現(xiàn)代
        合肥機(jī)場(chǎng)巴士4號(hào)線
        合肥機(jī)場(chǎng)巴士4號(hào)線
        合肥機(jī)場(chǎng)巴士3號(hào)線
        合肥機(jī)場(chǎng)巴士3號(hào)線
        合肥機(jī)場(chǎng)巴士2號(hào)線
        合肥機(jī)場(chǎng)巴士2號(hào)線
      4. 幣安app官網(wǎng)下載 短信驗(yàn)證碼 丁香花影院

        關(guān)于我們 | 打賞支持 | 廣告服務(wù) | 聯(lián)系我們 | 網(wǎng)站地圖 | 免責(zé)聲明 | 幫助中心 | 友情鏈接 |

        Copyright © 2024 hfw.cc Inc. All Rights Reserved. 合肥網(wǎng) 版權(quán)所有
        ICP備06013414號(hào)-3 公安備 42010502001045

        主站蜘蛛池模板: 亚洲AV福利天堂一区二区三| 中文字幕在线一区二区在线 | 一区二区三区精品高清视频免费在线播放| 无码国产精品一区二区免费虚拟VR | 日韩精品福利视频一区二区三区| 免费无码一区二区三区蜜桃| 波多野结衣一区二区三区高清在线 | 亚洲国产精品一区二区成人片国内| 国产一区二区三区免费在线观看| 国产短视频精品一区二区三区| 精品福利一区二区三区| 秋霞日韩一区二区三区在线观看| 国产乱码一区二区三区| 麻豆AV一区二区三区| 精品一区二区三区在线成人| 久久久精品一区二区三区 | 亚洲日韩AV一区二区三区中文| 久久一区二区明星换脸| 日本一区二区不卡视频| 亚洲AV色香蕉一区二区| 亚洲国产日韩一区高清在线 | 国产av熟女一区二区三区| 精品亚洲一区二区三区在线播放| 青娱乐国产官网极品一区| 无码AV一区二区三区无码| 亚洲福利视频一区二区| 国产在线精品一区二区不卡麻豆| 精品视频在线观看你懂的一区 | 免费av一区二区三区| 亚洲国产精品综合一区在线 | 美女毛片一区二区三区四区| 蜜臀Av午夜一区二区三区| 91精品一区二区三区久久久久| 亚洲福利视频一区二区三区| 亚洲AV无码一区二区三区牲色 | 一级毛片完整版免费播放一区 | 蜜臀AV无码一区二区三区| 日本一区二区三区在线观看视频 | 一区二区三区四区在线播放 | 日韩在线一区视频| 精品乱人伦一区二区|