合肥生活安徽新聞合肥交通合肥房產生活服務合肥教育合肥招聘合肥旅游文化藝術合肥美食合肥地圖合肥社保合肥醫院企業服務合肥法律

        INFS6071代做、代寫Python/c++編程語言
        INFS6071代做、代寫Python/c++編程語言

        時間:2024-09-05  來源:合肥網hfw.cc  作者:hfw.cc 我要糾錯



        INFS6071:
        Individual
        Assignment One
        Due: Week 9 (27 September
        2024, 2359hrs)
        The University of Sydney Business School
        2024
        INFS6071: Individual Assignment 1, S2-2024

        1
        Contents

        Background .................................................................................................................. 2
        Task ............................................................................................................................. 2
        The Deliverable ............................................................................................................ 4
        Submission Requirements ............................................................................................ 4
        Assessment Criteria ..................................................................................................... 5
        Marking criteria: Individual Assignment One ................................................................ 6


        INFS6071: Individual Assignment 1, S2-2024

        2
        Background
        (Assesses: LO1, LO2, LO3, LO4)

          The top reason for project failure is the project itself. Wrong
        projects are ones that defy conventional business rationale,
        creating outputs that either few people want, that add little to no
        real value, or that undershoot the desired benefits because they
        are so difficult to achieve. In short, they fail in rationale and
        objective reasoning. They are sometimes called   white elephants.    
        (Wu & Misra, 2023)
        Task
        Part A: Critical Path Analysis
        Description of Requirements: You are employed as a Project Manager at
        Comarda, and you have been awarded a contract to develop a new automated
        inventory control system for Assum Pullum Express, a new fast-food chicken chain
        opening several stores across New South Wales. The project's scope and work
        breakdown structure have already been decided upon. Tasks and their contents,
        durations, and resource requirements are shown in Table 1. Predecessors of tasks
        imply which tasks must be conducted before the current task can be started.


        Activity
        Code
        Task/Activity Duration
        in days
        Predecessors
        A Start-up planning and design 5 -
        B Equipment determination and planning 8 A
        C Specific software determination 9 A
        D Production line planning and determination 4 B
        E Equipment planning 7 B
        F Software planning 17 C
        G Equipment documentation 10 E
        H Documentation of operational system 13 F
        I Detailed hardware blueprints 7 E
        J Hardware component orders 1 I
        K Hardware component delivery 6 J
        L Integration of phase 1 12 D, G, H, K
        M Prototype development 10 L
        N Prototype introduction 6 M
        O System evaluation and improvement 9 N
        P Hardware assembly 18 N
        Q Computer system installation 7 P
        R Project documentation 4 O, P
        S Integration of phase 2 12 Q, R
        INFS6071: Individual Assignment 1, S2-2024

        3

        a. Create a network diagram using the activity on node (AON) notation
        representing the project, as presented in the unit. (2 marks)
         Identify the Critical Path: Use the table to determine the task
        sequence that forms the critical path.
         Calculate Start and Finish Times: For each task, calculate the
        earliest start (ES), earliest finish (EF), latest start (LS), and latest finish
        (LF) times.
         Calculate Slack Time: Determine the slack time for each task.
         You may use PowerPoint to draw and copy the diagram into your
        assignment document. You should not use Microsoft Project or
        any other project management software for this part of the
        assignment.

        b. In the context of the above project with Assum Pullum Express, explain
        possible key challenges in managing projects using its critical path. Please
        use appropriate references to support your explanation. (3 marks)


        Part B: Project Analysis
        Project management is a critical discipline in business. It aims to ensure that projects
        are within scope, completed on time, within budget, and to the desired quality
        standards. However, not all projects succeed. Understanding why projects fail is
        essential for future project managers to learn from past mistakes and improve their
        skills. This assessment aims to provide students with a comprehensive
        understanding of the complexities and challenges in project management by
        analysing real-world examples of failed projects.

        Importance of Analysing Failed Projects
         Learning from Mistakes: Analysing failed projects helps identify common
        pitfalls and mistakes, providing valuable lessons for future projects.
         Risk Management: Understanding the risks that led to project failures can
        improve risk management strategies.
         Improving Processes: Insights from failed projects can improve project
        management processes and methodologies.
         Stakeholder Communication: Failed projects often highlight stakeholder
        communication and management issues, offering lessons on how to handle
        these aspects better.
         Innovation and Adaptation: Learning from failures encourages innovation
        and adaptation, helping project managers to be more flexible and responsive
        to changes.

        You are to conduct independent research and select a recent project (in the last 5
        years) that can be considered a failure (from a project management perspective  C time,
        cost, budget).

        To accomplish this,
        1. Students are required to select one of the following recent failed projects,
        conduct a detailed analysis, and present their findings in a report. The report
        should cover the following aspects:
        INFS6071: Individual Assignment 1, S2-2024

        4
         Project Overview: Brief description of the context (country, industry,
        markets, company, products/services), the project, its objectives, and key
        stakeholders.
         Potential Reasons for Failure: Detailed analysis of the key factors that
        potentially led to the project's failure. There could be contradictory
        indicators or varied ideas presented in the literature. These reasons
        should be linked back to the Project Management Performance Domains
        and Project Principles.
         Impact: Examination of the impact of the failure on the organisation and
        stakeholders.
         Lessons Learned and Recommendations: Key lessons that can be
        learned from the project failure. Suggestions for how the project could
        have been managed differently to avoid failure.

        Notes
        1. Have a proposed project management case study to present to your tutor in
        your week 6 tutorial.
        2. All requirements about the case under investigation should be clearly
        addressed (Support your argument using appropriate references  Ce.g. news,
        trade press and academic).
        3. You may investigate a problem that occurred anywhere in the world, but all
        references, including the incident's source of information, must be available in
        English.
        The Deliverable
        Total written report: 2000   10% words (excluding in-text references and reference
        list).

        Part A: Critical Path Analysis ? 400 words

        Part B: Case Study Analysis ? 1600 words

        Note: Please use tables, diagrams, and charts to prepare a
        concise response.
        Submission Requirements
        Submit your report (Individual Assignment 1) by the due date shown on Canvas.

        You will find the link to submit the report in the Assignment section of Canvas.

        The report should be formatted using A4 paper size, 1.5 line spacing, 2.5cm margins,
        and a sans-serif font size of at least 12pt (e.g., Arial, Helvetica, Calibri, Aptos).

        INFS6071: Individual Assignment 1, S2-2024

        5
        Late submissions will be penalised in accordance with the University and Business
        School Policy as set out in the UoS outline.
        Artificial Intelligence
        This assignment is considered a   Lane 2  C Examples of human-AI collaboration in
          assessment as learning     assessment type.

        You are permitted to use generative AI to help you; this use must be
        acknowledged. For example, you may use AI tools such as (ChatGPT, Google
        Gemini, and Microsoft CoPilot) to brainstorm ideas for your assignment. You may
        use AI tools such as (Grammarly, Notion AI, ChatGPT, etc.) to directly suggest
        readability improvements to your text in terms of grammar and expression.

        Do not post confidential, private, personal, or otherwise sensitive information into
        these tools. If you use these tools, you must be aware of their limitations, biases, and
        propensity for fabrication. Your use of AI tools must adhere to the Student Charter
        2020, including upholding honesty, ethics, professionalism, and academic integrity.

        Acknowledgement of AI
        If you use any AI tools, you need the following:

        1. An acknowledgement:
        I acknowledge using [insert tool name] to [what the tool did] on <>. With the
        <>. What then happened?

        For example, I acknowledge using ChatGPT (https://chat.openai.com/) to refine the
        academic language of my own work. On 1 July 2024, I submitted my entire essay to
        refine the academic language of my own work. The original essay can be found here
        [link]. With the prompt:   For the following essay, can you improve the academic tone
        and accuracy of language, including grammatical structures, punctuation and
        vocabulary?  . The output [link] was then modified further to better represent my tone
        and style of writing.

        2. Copies of the work before and after using the AI tools  C see above for links in
        the acknowledgement.

        3. The output produced by AI tools is non-deterministic (i.e., another person
        cannot obtain the same information as you did); thus, citing AI tools is not a
        source and is inappropriate for an assignment.

        Assessment Criteria
        The individual assignment weighting equals 25% of your final grade.

        General explanation of standards: Please refer to the grade descriptors located on
        Canvas. These grade descriptors are used to construct marking schemes for all
        assessment items.
        INFS6071: Individual Assignment 1, S2-2024

        6
        Marking criteria:
        Individual Assignment One

        Criteria Marks allocated
        Part A: Critical Path Analysis
        Marks for (a) of the assignment are awarded for the diagram's
        design and the answer's correctness.
        Marks for (b) are awarded in the context of the project, how you
        explain key challenges in managing a project using its critical path.

        Part B: Case Study
        Content, knowledge, and originality of analysis
        Demonstrates detailed knowledge of the topic and awareness of a
        variety of ideas/contexts based on a wide range of sources that
        have been thoroughly analysed, applied, and discussed.
        Application and integration of appropriate project management
        knowledge, innovative, and insightful, with an appreciation of
        disciplinary gaps, limitations, and inconsistencies shown in key
        areas of the discussion. The analysis is original and can develop
        and justify students' ideas.

        8
        Critical thinking and reasoning
        Analytical and clear conclusion provided that is well-grounded in
        project management theory and the literature. A critical review of
        evidence supports the development of the recommendations and
        their significance from a project management perspective,
        including contradictory information/gaps identified and reasons for
        contradictions/limitations.

        6
        Information literacy/Use of Literature
        Relevant and innovative choices of information sources,
        demonstrating well-designed search strategies.
        An upper limit of ten (10) references (both industry [grey] and
        academic) is recommended.

        3
        Communication and professional presentation (written)
        Communicates meaning competently; in own words, structuring and
        organising ideas logically, clearly, concisely, and cohesively. The
        purpose of the assignment is addressed comprehensively and
        imaginatively. Appropriate referencing and referencing style used
        (APA 7th). Fluent writing style appropriate to report. Grammar and
        spelling are accurate.

        請加QQ:99515681  郵箱:99515681@qq.com   WX:codinghelp





         

        掃一掃在手機打開當前頁
      1. 上一篇:代寫 SWEN30006_2024_SM2 Specification for&#160;Automail
      2. 下一篇:代做QBUS6600、代寫Python編程語言
      3. 無相關信息
        合肥生活資訊

        合肥圖文信息
        挖掘機濾芯提升發動機性能
        挖掘機濾芯提升發動機性能
        戴納斯帝壁掛爐全國售后服務電話24小時官網400(全國服務熱線)
        戴納斯帝壁掛爐全國售后服務電話24小時官網
        菲斯曼壁掛爐全國統一400售后維修服務電話24小時服務熱線
        菲斯曼壁掛爐全國統一400售后維修服務電話2
        美的熱水器售后服務技術咨詢電話全國24小時客服熱線
        美的熱水器售后服務技術咨詢電話全國24小時
        海信羅馬假日洗衣機亮相AWE  復古美學與現代科技完美結合
        海信羅馬假日洗衣機亮相AWE 復古美學與現代
        合肥機場巴士4號線
        合肥機場巴士4號線
        合肥機場巴士3號線
        合肥機場巴士3號線
        合肥機場巴士2號線
        合肥機場巴士2號線
      4. 幣安app官網下載 短信驗證碼 丁香花影院

        關于我們 | 打賞支持 | 廣告服務 | 聯系我們 | 網站地圖 | 免責聲明 | 幫助中心 | 友情鏈接 |

        Copyright © 2024 hfw.cc Inc. All Rights Reserved. 合肥網 版權所有
        ICP備06013414號-3 公安備 42010502001045

        主站蜘蛛池模板: 中文字幕一区二区三| 中文字幕日韩一区二区三区不卡| 麻豆一区二区三区蜜桃免费| 国产午夜精品一区理论片飘花| 99精品一区二区免费视频| 高清一区二区在线观看| 韩国资源视频一区二区三区| 久久伊人精品一区二区三区| 国产成人无码一区二区在线观看 | 国产精品无码AV一区二区三区| 国产av一区最新精品| 久久人妻内射无码一区三区| 久久国产精品一区| 精品在线一区二区| 国产一区二区三区无码免费| 手机福利视频一区二区| 一区二区三区视频| 在线成人一区二区| 成人h动漫精品一区二区无码| 精品国产一区二区三区不卡| 日韩内射美女人妻一区二区三区| 国产av一区二区三区日韩| 亚洲线精品一区二区三区影音先锋| 痴汉中文字幕视频一区| 亚洲第一区精品观看| 东京热无码av一区二区| 国产一区二区三区免费观在线| 国产在线精品一区二区高清不卡 | 熟妇人妻系列av无码一区二区 | 国产高清在线精品一区小说| 高清一区二区三区| 99精品高清视频一区二区| 一区二区三区视频在线播放| www.亚洲一区| 亚洲啪啪综合AV一区| 久久久久人妻精品一区二区三区| 中文字幕亚洲综合精品一区| 精产国品一区二区三产区| 国产精品一区不卡| 日本高清成本人视频一区| 激情内射亚洲一区二区三区|