合肥生活安徽新聞合肥交通合肥房產生活服務合肥教育合肥招聘合肥旅游文化藝術合肥美食合肥地圖合肥社保合肥醫院企業服務合肥法律

        代寫Summer Process Control 、MATLAB編程設計代做

        時間:2024-06-26  來源:合肥網hfw.cc  作者:hfw.cc 我要糾錯



        2024 Summer Process Control 
        Homework #6 (100) 
         
        Problem 1 (25) 
         
        A heat transfer process has the following transfer function between a temperature T and an inlet flow rate q 
        where the time constants have units of minutes: 
         
        The inlet flow rate varies as sinusoidal function with amplitude of 2.5 L/min and a period of 0.5 min. 
        What is the amplitude of the temperature after a long time? 
         
        Problem 2 (25) 
         
        Consider a closed loop system with negative feedback, with the process 
        The time constant of the process is in seconds. A sensor has unit steady state gain and zero time constant. 
         
        Obtain the steady-state output of the system when it is subjected to each of the following inputs in set point: 
         
         a) x(  )=sin(  +30°); 
        b) x(  )=3cos(2  −45°); 
        c) x(  )=sin(  +30°)+3cos(2  −45°). 
         
        For all these cases, angular velocities are in radians per second. 
         
        Problem 3 (50) 
         
        For control system on the Figure, 
         
        a) determine the offset for a unit-step change in set-point; 
        b) determine the characteristic equation of the closed-loop response; 
        c) determine the range of     
         for stability (use the Routh stability criterion and Direct substitution 
        Method); 
        d) using MATLAB, plot Bode diagrams for the closed-loop system and determine the values of the 
        ultimate gain and critical frequency; 
        e) evaluate the stability of the closed-loop control system using the analytical Bode stability criterion; 
        f) determine the tuning parameters of P, PI and PID controllers (    
        ) using Ziegler-Nichols method; 
        g) draw the response curves ( Y versus t ) for a unit-step change in set-point for cases when P, PI and PID 
        controllers were used (plot all three curves on one plot using Matlab). 
          
         
        Bonus Problem (5) 
        Draw the Bode plots for following system. Format the plots and label the axes. Determine the values of the 
        ultimate gain and critical frequency.



        請加QQ:99515681  郵箱:99515681@qq.com   WX:codinghelp

        掃一掃在手機打開當前頁
      1. 上一篇:菲律賓面積相當于中國哪?和哪個最接近
      2. 下一篇:菲律賓跟團簽證怎么辦理流程(跟團簽證的費用)
      3. 無相關信息
        合肥生活資訊

        合肥圖文信息
        挖掘機濾芯提升發動機性能
        挖掘機濾芯提升發動機性能
        戴納斯帝壁掛爐全國售后服務電話24小時官網400(全國服務熱線)
        戴納斯帝壁掛爐全國售后服務電話24小時官網
        菲斯曼壁掛爐全國統一400售后維修服務電話24小時服務熱線
        菲斯曼壁掛爐全國統一400售后維修服務電話2
        美的熱水器售后服務技術咨詢電話全國24小時客服熱線
        美的熱水器售后服務技術咨詢電話全國24小時
        海信羅馬假日洗衣機亮相AWE  復古美學與現代科技完美結合
        海信羅馬假日洗衣機亮相AWE 復古美學與現代
        合肥機場巴士4號線
        合肥機場巴士4號線
        合肥機場巴士3號線
        合肥機場巴士3號線
        合肥機場巴士2號線
        合肥機場巴士2號線
      4. 幣安app官網下載 短信驗證碼 丁香花影院

        關于我們 | 打賞支持 | 廣告服務 | 聯系我們 | 網站地圖 | 免責聲明 | 幫助中心 | 友情鏈接 |

        Copyright © 2024 hfw.cc Inc. All Rights Reserved. 合肥網 版權所有
        ICP備06013414號-3 公安備 42010502001045

        主站蜘蛛池模板: 精品国产毛片一区二区无码| 亚洲一区二区观看播放| 国产免费一区二区三区不卡| 国产av熟女一区二区三区| 亚洲日韩国产精品第一页一区| 亚拍精品一区二区三区| 福利电影一区二区| 亚洲国产韩国一区二区| 亚洲免费视频一区二区三区| 亚洲综合在线成人一区| 精品国产毛片一区二区无码| 亚洲AV无码一区二区三区网址| 国产色情一区二区三区在线播放 | 亚洲AV成人精品日韩一区| 色一情一乱一伦一区二区三区 | 国产在线不卡一区二区三区| 亚洲日韩精品国产一区二区三区| 在线精品亚洲一区二区三区| 美日韩一区二区三区| 97se色综合一区二区二区| 国产在线一区二区在线视频| 日韩精品电影一区亚洲| 国产SUV精品一区二区四 | 春暖花开亚洲性无区一区二区 | 无码日韩人妻AV一区免费l| 亚洲码一区二区三区| 任你躁国产自任一区二区三区| 国产在线第一区二区三区| 97se色综合一区二区二区| 亚洲一区二区成人| 国产在线无码视频一区二区三区 | 亚洲性色精品一区二区在线| 日韩精品一区二区三区大桥未久| www一区二区三区| 蜜桃视频一区二区| 日本精品一区二区三区在线视频一| 国产乱码精品一区二区三区香蕉| 亚洲一区二区三区在线| 人体内射精一区二区三区| 亚洲视频一区调教| 亚洲视频一区二区在线观看|