合肥生活安徽新聞合肥交通合肥房產(chǎn)生活服務(wù)合肥教育合肥招聘合肥旅游文化藝術(shù)合肥美食合肥地圖合肥社保合肥醫(yī)院企業(yè)服務(wù)合肥法律

        代寫Summer Process Control 、MATLAB編程設(shè)計代做

        時間:2024-06-26  來源:合肥網(wǎng)hfw.cc  作者:hfw.cc 我要糾錯



        2024 Summer Process Control 
        Homework #6 (100) 
         
        Problem 1 (25) 
         
        A heat transfer process has the following transfer function between a temperature T and an inlet flow rate q 
        where the time constants have units of minutes: 
         
        The inlet flow rate varies as sinusoidal function with amplitude of 2.5 L/min and a period of 0.5 min. 
        What is the amplitude of the temperature after a long time? 
         
        Problem 2 (25) 
         
        Consider a closed loop system with negative feedback, with the process 
        The time constant of the process is in seconds. A sensor has unit steady state gain and zero time constant. 
         
        Obtain the steady-state output of the system when it is subjected to each of the following inputs in set point: 
         
         a) x(  )=sin(  +30°); 
        b) x(  )=3cos(2  −45°); 
        c) x(  )=sin(  +30°)+3cos(2  −45°). 
         
        For all these cases, angular velocities are in radians per second. 
         
        Problem 3 (50) 
         
        For control system on the Figure, 
         
        a) determine the offset for a unit-step change in set-point; 
        b) determine the characteristic equation of the closed-loop response; 
        c) determine the range of     
         for stability (use the Routh stability criterion and Direct substitution 
        Method); 
        d) using MATLAB, plot Bode diagrams for the closed-loop system and determine the values of the 
        ultimate gain and critical frequency; 
        e) evaluate the stability of the closed-loop control system using the analytical Bode stability criterion; 
        f) determine the tuning parameters of P, PI and PID controllers (    
        ) using Ziegler-Nichols method; 
        g) draw the response curves ( Y versus t ) for a unit-step change in set-point for cases when P, PI and PID 
        controllers were used (plot all three curves on one plot using Matlab). 
          
         
        Bonus Problem (5) 
        Draw the Bode plots for following system. Format the plots and label the axes. Determine the values of the 
        ultimate gain and critical frequency.



        請加QQ:99515681  郵箱:99515681@qq.com   WX:codinghelp

        掃一掃在手機打開當前頁
      1. 上一篇:菲律賓面積相當于中國哪?和哪個最接近
      2. 下一篇:菲律賓跟團簽證怎么辦理流程(跟團簽證的費用)
      3. 無相關(guān)信息
        合肥生活資訊

        合肥圖文信息
        急尋熱仿真分析?代做熱仿真服務(wù)+熱設(shè)計優(yōu)化
        急尋熱仿真分析?代做熱仿真服務(wù)+熱設(shè)計優(yōu)化
        出評 開團工具
        出評 開團工具
        挖掘機濾芯提升發(fā)動機性能
        挖掘機濾芯提升發(fā)動機性能
        海信羅馬假日洗衣機亮相AWE  復(fù)古美學與現(xiàn)代科技完美結(jié)合
        海信羅馬假日洗衣機亮相AWE 復(fù)古美學與現(xiàn)代
        合肥機場巴士4號線
        合肥機場巴士4號線
        合肥機場巴士3號線
        合肥機場巴士3號線
        合肥機場巴士2號線
        合肥機場巴士2號線
        合肥機場巴士1號線
        合肥機場巴士1號線
      4. 短信驗證碼 酒店vi設(shè)計 NBA直播 幣安下載

        關(guān)于我們 | 打賞支持 | 廣告服務(wù) | 聯(lián)系我們 | 網(wǎng)站地圖 | 免責聲明 | 幫助中心 | 友情鏈接 |

        Copyright © 2025 hfw.cc Inc. All Rights Reserved. 合肥網(wǎng) 版權(quán)所有
        ICP備06013414號-3 公安備 42010502001045

        主站蜘蛛池模板: 美日韩一区二区三区| 色婷婷综合久久久久中文一区二区| 亚洲国产激情一区二区三区| 成人乱码一区二区三区av| 日韩免费视频一区| 中文字幕AV一区二区三区人妻少妇| 亚洲A∨无码一区二区三区| 日本一区二区三区在线视频观看免费| 亚洲av乱码一区二区三区| 久久se精品动漫一区二区三区| 国产91一区二区在线播放不卡| 国产成人精品亚洲一区| 亚洲欧美日韩一区二区三区| 91一区二区三区四区五区| 亚洲av无码一区二区三区不卡| 日韩精品人妻一区二区中文八零| 丰满人妻一区二区三区免费视频| 影院无码人妻精品一区二区| 全国精品一区二区在线观看| 福利一区二区三区视频午夜观看| 日本精品一区二区在线播放| 国产SUV精品一区二区88| 日本一道高清一区二区三区| 亚洲综合无码一区二区痴汉| 精品无人区一区二区三区| 亚洲视频免费一区| 无码精品一区二区三区| 麻豆AV天堂一区二区香蕉 | 夜色阁亚洲一区二区三区| 国产一区二区三区播放| 搜日本一区二区三区免费高清视频| 国产一区二区在线视频播放| 国产精品第一区第27页| 2014AV天堂无码一区| 日韩人妻不卡一区二区三区| 亚洲av无码片vr一区二区三区| 在线一区二区观看| 91福利国产在线观看一区二区| 久久久久成人精品一区二区| 中文字幕亚洲综合精品一区| 午夜在线视频一区二区三区|